Please feel free click the link at the bottom of any post and leave a comment, suggestion, or anything pertinent to the project.
The rear hatch is currently being constructed.
Mr. Simmons, Ian, and Shane discussing the construction plan for the hatch.
Ian, Shane, Derek, and John all hard at work.
John working on the installation of the hinge.
Derek constructing the frame.
Derek and Ian are assembling the hatch.
John is nailing the hatch together.
Monday, April 27, 2009
Wednesday, April 22, 2009
Air Conditioner
Friday, April 17, 2009
Roof
Please feel free click the link at the bottom of any post and leave a comment, suggestion, or anything pertinent to the project.
The roof has had some more work done to it.
All Wood Glue by Smith&Co. was used to glue the 1/2"x 2 1/2" oak trim pieces.
Fill It Epoxy Filler was used to fill the kerfs and screw holes.
The interior cabinets have been finished.
The roof has had some more work done to it.
All Wood Glue by Smith&Co. was used to glue the 1/2"x 2 1/2" oak trim pieces.
Fill It Epoxy Filler was used to fill the kerfs and screw holes.
The interior cabinets have been finished.
Tuesday, April 14, 2009
Electrical Work
Please feel free click the link at the bottom of any post and leave a comment, suggestion, or anything pertinent to the project.
Today, an interior light was installed. The wiring was soldered and then secured together using thin wall heat shrink tubing from NAPA.
Derek working on the light.
The insulation board is being installed today as well.
Today, an interior light was installed. The wiring was soldered and then secured together using thin wall heat shrink tubing from NAPA.
Derek working on the light.
The insulation board is being installed today as well.
Thursday, April 9, 2009
Framework
Friday, April 3, 2009
Interior Roof Panels
Please feel free click the link at the bottom of any post and leave a comment, suggestion, or anything pertinent to the project.
In the past few days, we have been contouring the birch plywood to fit the shape of the trailer.
The plywood was sprayed with hot water and tensioned with ratchet straps. We also boiled water and layed wet towels on the surface over night.
The ceiling was shaped by forming the birch around the outside, and being adjusted as needed during installation.
In the past few days, we have been contouring the birch plywood to fit the shape of the trailer.
The ceiling was shaped by forming the birch around the outside, and being adjusted as needed during installation.