Tuesday, January 25, 2011

Floor tile and Drawer.

They installed the drawer for the cooler after the tile.
















Layton installing the floor tile.



Windows

Ron, Chris, and Layton are installing the windows.


















Monday, January 10, 2011

Trailer Hatch

We are fitting the rear hatch on the trailer before painting.